LED buried lights buried in the underground landscape lighting, the waterproof level must reach IP67 or above, before the installation work, should be prepared from several aspects:
LED underground light
First, the preparation work before installation
1. When installing the LED to bury the lamp, the power must be cut off for safety to ensure safe installation;
2. Before installing the LED buried lamp, check whether the connection of the LED underground light and the matching accessories are complete. The LED buried lamp is fixed in the ground after installation, and it is relatively troublesome to disassemble. If the missing parts are found after installation, the disassembly may sometimes require destructive disassembly. Therefore, it should be checked before installation;
3. Before installing the LED buried lamp, first bury the buried trench according to the installation size of the LED buried lamp, and then fix the embedded part with concrete. The embedded part serves to isolate the LED from the main body of the lamp and the soil, and can ensure the service life of the LED buried lamp;
4. Before installing the LED underground lamp, you should have an IP67 or IP68 wiring device for connecting the external power input to the power cable of the lamp body. Moreover, the power cord of the LED buried lamp requires a VDE-certified waterproof power cord to ensure the service life of the LED buried lamp.
Second, the installation process and wiring diagram
Installation process and wiring diagram
The effect of LED underground light is similar to that of LED wall washers and LED wall lights . It is generally divided into two types: monochrome constant light and DMX512 effect change. For detailed wiring, please refer to the following figure.