China-High-Quality-Hot-DIP-Galvanized-Steel-Mono-Pole-Power-Transmission-Towers

Name:
Electricity Power Transmission Tower
Place of Origin:
Tianjin, China
Material:
Normally Q345B/A572, Minimum Yield Strength ≥ 345 N/mm²
Q235B/A36, Minimum Yield Strength ≥ 235 N/mm²
As well as Hot rolled coil from ASTM A572 GR65, GR50, SS400, or any other standard by client required.
Tower Type:
Steel Tube, Angle Steel, Lattice Mast, Self-Supporting
Tower Style:
Mono Pole Tower, Three Legs Tower, Four Legs Tower
Voltage:
Below 500KV, customized.
Wind Pressure:
0.35-1 KN/m2, customized.
Connection:
Flanges, Inserting, Connecting Plate & Bolt
Surface Treatment:
Hot Dipped Galvanized
Zinc Coating:
65μ-85μ
Supply Capacity:
3000 MT/Month
Color:
Galvanized, or customized
Usage:
Electricity Power Transmission Tower, Electrical Substation Structure etc.
Certification:
ISO9001:2008, ISO14001:2004, OHSAS18001: 2007, SGS, MA


Mainly Products Type:

I. Telecommunication Towers
1. Monopole Telecommunications Towers
2. 3 Legs Telecom Towers
3. 4 Legs Communication Towers
4. Telecom Integrated Base Station
5. Angle Steel Communication Tower
6. Bionic Pine Tree Telecommunication Tower 
7. Bionic Artificial Coconut Tree Telecom Tower
8. Light Telecommunication Tower 
9. Garden Monopole Telecommunication Towers
10. Roof Landscaping Telecom Towers

II. Power Transmission Towers
1. Mono Pole Power Transmission Towers
2. Angle Steel Power Transmission Towers
3. Electrical Substation Structure

III. Ground Solar Panel Mounting Structure


Why Choose Us?
1.Manufacturer and with 20 years' experience.
2.Cooperated with ZTE, and exported to 27 countries.
3.RMB 180 Million registered capital.
4.The factory covers an area of 18,800 square meters.
5.Only 40 KM to Tianjin port.
6.36 kinds of design patents.
7.Own professional R & D team.
8.Directly after service for quality assurance and technical support.
9.Produce and design according to customers' requirements.
10.Certification: ISO9001:2008, ISO14001:2004, OHSAS18001: 2007, SGS, MA

FAQ:
1. MOQ: 10 MT
2.Port of Loading: Tianjin, China
3.Payment: T/T, L/C at sight. 30% deposit and 70% before delivery.
4.Delivery Time: In 15-35 days after received payment, also according to quantity.
5.Supply Capacity: 3000 MT/Month 
6.Packaging & Shipping: In Bundle, or as customers' requirements.

Tianjin Fanghua Communication Engineering Co., Ltd
Welcome your inquiry!

Ningbo Autrends International Trade Co.,Ltd. , https://www.supervapebar.com