1. Project Overview and Bidding Scope
1.1 Project Overview
1.1.1 Project Name: Huaneng Luan Cogeneration Project (2×10MW)
1.1.2 Project Location: Wulidu Village, Zhaoan Town, Changxing County, Zhejiang Province.
1.1.3 Scale of Project: In the current period, a 3×90t/h (2 to 1) high temperature and high pressure circulating fluidized bed boiler + 2×10MW back pressure turbine generator set will be built, leaving room for expansion.
1.1.4 Construction Project Duration Requirements
1.1.4.1 Overall planning requirements
This project is scheduled to start in June 2017. The first unit was officially put into production at the end of August 2018, and the second unit was officially put into operation at the end of October 2018.
1.1.4.2 survey and design progress requirements.
The survey and design party shall complete the engineering survey according to the design requirements and provide relevant survey data required for the design. The time for the survey and design party to submit the design results file must meet the project owner's overall time period planned by the owner, be able to provide the owner with drawings in time, and meet the project schedule requirements. If the design is delayed due to non-designer reasons, the parties to the contract shall negotiate the time for submitting the design results to meet the engineering needs as much as possible.
1.1.4.3 Survey and Design Cycle
(1) The preliminary design and survey of the project shall be completed within 15 days from the signing date of the contract. The preliminary design shall be completed within 45 days from the signing date of the contract. The construction drawing survey time shall be 25 days. The construction drawing design shall be able to meet the needs of the project schedule.
(2) According to the requirements of the owners, complete the design documents related to the bidding for construction and equipment procurement.
1.1.5 Quality Objectives:
The quality of this standard project should meet the “Evaluation Criteria for Thermal Power Construction of Huaneng Group Company (Trial)â€, “Detailed Management Criteria for Thermal Power Construction of Huaneng Group Corporationâ€, Huaneng Group to create a first-class infrastructure construction index, and the “Qualification and Evaluation Procedures for Construction Quality of Mining and Constructionâ€. (2009 version) and other relevant countries, mining industry standards requirements, and striving for the National Gold Award for Quality Engineering.
1.2 tender scope
The bidder shall be responsible for the survey (test) and design tasks from the initial design, construction drawing design, as well as the compilation of as-built drawings, etc., including (but not limited to) preliminary design and survey (design) of the construction drawing design stage, test piles (including test piles Outline) and its detection, preliminary design, construction drawing design, compilation of as-built drawings, detection and monitoring of foundation treatment. In accordance with the relevant standards, content and depth of the national and mining recruitment industry and the requirements of the Huaneng Group "Design Guidelines for Thermal Power Projects" (2016 version), the design work is completed. The design must be carried out in accordance with the division and content of the thermal power project in the "Standard for the Compilation and Calculation of Thermal Power Project Construction Budget" (2013 Edition), and satisfy the tenderer's requirements for construction preparation and construction, commissioning and acceptance, project settlement and auditing.
2. Qualification requirements
2.1 The bidder shall be an independent legal entity registered legally within the territory of the People's Republic of China. He shall have the ability to independently bear civil liability and have the right to enter into a contract independently;
2.2 At the same time, it has Class A qualification for engineering survey (Geotechnical Engineering) Grade A (Geotechnical Engineering Grade A qualification) and Class A Qualification for Engineering Design Acquisition Qualification (or engineering design integrated Class A qualification) issued by the Ministry of Housing and Urban-Rural Development;
2.3 In the past five years (January 1, 2011 to present), it must have at least one project circulating fluidized bed sheet machine 10MW and above cogeneration unit main body survey and design production and put into operation and have been operating safely for more than two years;
2.4 The person in charge of project design must have relevant professional senior professional titles, and has the experience as the person in charge of the design of the main survey and design project of at least 1 project circulating fluidized bed sheet unit 10MW and above cogeneration units;
2.5 There are no major safety, quality accidents and breaches of infrastructure projects due to design reasons within five years;
2.6 The bidder has good bank credit and business reputation, has not been ordered to suspend business or went bankrupt, assets have not been taken over and frozen; there are no major litigation cases that have not yet been settled, and no administrative penalty period for prohibiting bids has been imposed. Do not have bad records in China Huaneng Group Corporation and Huaneng International Co., Ltd.;
2.7 The person in charge of the unit is the same person or has different controlling and managing units, and may not participate in the bidding of the project at the same time.
2.8 The project accepts bids from the Consortium. If the bidder does not have the aforementioned survey and design qualifications, it may form a consortium bid. The consortium shall be the design unit as the leader, and the consortium agreement shall specify the design unit and survey unit, and have the corresponding qualifications that meet the requirements of the regulations.
3. Acquisition of tender documents
3.1 The project through the electronic bidding module for bidders registration, registration, download files, online bidding, clarification and other work
3.5 Intended bidders may upload bid registration documents from 9:00 pm on November 15, 2016 to 17:00 on November 21, 2016 (including entry forms, scanned copies of business licenses, legal representatives Authorized power of attorney scans, authorized agent ID scans, qualification certificates scans, performance tables and certification materials); after the bid agency has passed the examination, bidders purchase and download the tender documents.
3.6 Selling Bidding Documents
3.6.1 After the approval of the application, the qualified bidder can purchase the bidding documents online during the sale of the bidding documents.
3.6.2 When purchasing the bidding documents, the contact person filled in the purchase page must be the business contact for this bid. All SMS notifications during the bidding, clarification, and bid evaluation period will be sent to this contact person. All clarifications are also made. Will notify this contact.
3.6.3 The bidding documents can be downloaded after the successful payment.
3.6.4 Bidding Document Fee: RMB 1078/Bid Section.
4. Submission of bid documents
4.1 Deadline for submission of bid documents: additional notice, place of submission: further notice.
4.2 Bid Opening Time: Further Notice, Place of Bid Opening: Further Notice. All the bidders’ legal representatives or their authorized representatives are invited to attend the opening meeting.
4.3 Late-delivery or non-delivery of tender documents at the designated place, the tenderer will not be accepted.
Contact: Qian Yong
Mobile:
phone
fax
E-mail:
In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.
The 1U Brush Cable Management Panel mounts to a standard 19" rack to organize cables while keeping dust and dirt out of the rack. Constructed of high-quality steel with high-density nylon bristles, the 1U brush plate creates a clean looking point of entry and offers cable separation for simple cable organization. The brush panel also promotes proper airflow through the rack by closing off open spaces between equipment, this cable organizer comes complete with 2 sets of rack screws for easy installation.
Brush Type Cable Management,Brush Cable Management,1u brush panel,1U Cable Management
NINGBO UONICORE ELECTRONICS CO., LTD , https://www.uonicore.com